Lifecycle Controller: OS Deployment on Dell Server
To deploy OS via Dell Lifecycle Control (All remote via iDrac).
- F10 on start to access "Lifecycle Controller".
- Enter "Advanced Hardware Configuration" to set pre set up like TPM and Secure boot.

- System BIOS > System Information > System Security.



4. TPM on.

5. Secure Boot: Enabled

- Set boot setting.

- Check the UEFI boot sequence.



- Done for pre-setup. Exit and back to Lifecycle controller page.

- OS Deployment > Deploy OS.


- Select "Go Directly to OS Deployment" (As we have already created a RAID before).


- Select an Operating System.

- Next.

- Installation Mode > Manual Install.

- Select OS Media > USB (We repaired USB Boot before).

15. Next > Yes.

- Review the config and click "Finish".

- System will reboot.


- Entering "Windows Server Setup".





- Disk 0 is the disk destination to install. Clear the partition and install on disk 0.





- Select disk 0 for the location to install Windows Server.

- Install.










- Finish.
